{"id":139787,"date":"2023-09-11T11:59:42","date_gmt":"2023-09-11T09:59:42","guid":{"rendered":"https:\/\/newmobility.news\/?p=139787"},"modified":"2023-09-11T11:59:42","modified_gmt":"2023-09-11T09:59:42","slug":"gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling","status":"publish","type":"post","link":"https:\/\/newmobility.news\/en\/2023\/09\/11\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\/","title":{"rendered":"Gotthard tunnel closed due to 25-meter crack in ceiling"},"content":{"rendered":"The Gotthard tunnel, at 16,9 km the longest road tunnel in Switzerland, has been closed since Sunday. The reason is a crack in the ceiling of the tunnel, which is popular with motorists driving to and from Italy. Chunks of concrete landed on the road, but no one was injured, said FEDRO, the Swiss ag<div class=\"leaky_paywall_message_wrap\"><div id=\"leaky_paywall_message\">This content has been archived. <a href=\"https:\/\/newmobility.news\/en\/subscription\/\">Log in or Subscribe<\/a> to a level that has access to archived content.<\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>The Gotthard tunnel, at 16,9 km the longest road tunnel in Switzerland, has been closed since Sunday. The reason is a crack in the ceiling of the tunnel, which is popular with motorists driving to and from Italy. Chunks of concrete landed on the road, but no one was injured, said FEDRO, the Swiss agThis [&hellip;]<\/p>\n","protected":false},"author":164,"featured_media":139791,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"_wpas_customize_per_network":false},"categories":[7,26,31,4],"tags":[],"class_list":["post-139787","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mobility","category-public-transport","category-road-safety","category-top-stories-today"],"acf":[],"featured_image_urls_v2":{"full":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?fit=1460%2C940&ssl=1",1460,940,false],"thumbnail":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?resize=150%2C150&ssl=1",150,150,true],"medium":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?fit=300%2C193&ssl=1",300,193,true],"medium_large":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?fit=640%2C412&ssl=1",640,412,true],"large":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?fit=640%2C412&ssl=1",640,412,true],"1536x1536":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?fit=1460%2C940&ssl=1",1460,940,true],"2048x2048":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?fit=1460%2C940&ssl=1",1460,940,true],"trp-custom-language-flag":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?fit=18%2C12&ssl=1",18,12,true],"related-thumb":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?resize=640%2C480&ssl=1",640,480,true],"gform-image-choice-sm":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?resize=300%2C300&ssl=1",300,300,true],"gform-image-choice-md":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?resize=400%2C400&ssl=1",400,400,true],"gform-image-choice-lg":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?resize=600%2C600&ssl=1",600,600,true],"mailchimp":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?fit=560%2C361&ssl=1",560,361,true],"unipress-phone":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?resize=640%2C100&ssl=1",640,100,true],"unipress-tablet":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?resize=1460%2C240&ssl=1",1460,240,true],"unipress-tablet-portrait":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?resize=1460%2C180&ssl=1",1460,180,true],"unipress-tablet-landscape":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?resize=1460%2C180&ssl=1",1460,180,true],"unipress-smartphone":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?resize=1080%2C168&ssl=1",1080,168,true],"unipress-wide-screen":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?resize=1460%2C180&ssl=1",1460,180,true]},"post_excerpt_stackable_v2":"<p>The Gotthard tunnel, at 16,9 km the longest road tunnel in Switzerland, has been closed since Sunday. The reason is a crack in the ceiling of the tunnel, which is popular with motorists driving to and from Italy. Chunks of concrete landed on the road, but no one was injured, said FEDRO, the Swiss agThis content has been archived. Log in or Subscribe to a level that has access to archived content.<\/p>\n","category_list_v2":"<a href=\"https:\/\/newmobility.news\/en\/category\/mobility\/\" rel=\"category tag\">Mobility<\/a>, <a href=\"https:\/\/newmobility.news\/en\/category\/public-transport\/\" rel=\"category tag\">Public transport<\/a>, <a href=\"https:\/\/newmobility.news\/en\/category\/road-safety\/\" rel=\"category tag\">Road safety<\/a>, <a href=\"https:\/\/newmobility.news\/en\/category\/top-stories-today\/\" rel=\"category tag\">Top Stories Today<\/a>","author_info_v2":{"name":"Luc Joris","url":"https:\/\/newmobility.news\/en\/author\/belga-5\/"},"comments_num_v2":"0 comments","yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Gotthard tunnel closed due to 25-meter crack in ceiling - newmobility.news<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newmobility.news\/en\/2023\/09\/11\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gotthard tunnel closed due to 25-meter crack in ceiling - newmobility.news\" \/>\n<meta property=\"og:description\" content=\"The Gotthard tunnel, at 16,9 km the longest road tunnel in Switzerland, has been closed since Sunday. The reason is a crack in the ceiling of the tunnel, which is popular with motorists driving to and from Italy. Chunks of concrete landed on the road, but no one was injured, said FEDRO, the Swiss agThis [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newmobility.news\/en\/2023\/09\/11\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\/\" \/>\n<meta property=\"og:site_name\" content=\"newmobility.news\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/search\/top\/?q=newmobility.news\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-11T09:59:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1460\" \/>\n\t<meta property=\"og:image:height\" content=\"940\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Luc Joris\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@jorisvry\" \/>\n<meta name=\"twitter:site\" content=\"@jorisvry\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Luc Joris\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/2023\\\/09\\\/11\\\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2023\\\/09\\\/11\\\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\\\/\"},\"author\":{\"name\":\"Luc Joris\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#\\\/schema\\\/person\\\/a31e684b1039b4a94985a9aae156f28b\"},\"headline\":\"Gotthard tunnel closed due to 25-meter crack in ceiling\",\"datePublished\":\"2023-09-11T09:59:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2023\\\/09\\\/11\\\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\\\/\"},\"wordCount\":220,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2023\\\/09\\\/11\\\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Untitled.png?fit=1460%2C940&ssl=1\",\"articleSection\":[\"Mobility\",\"Public transport\",\"Road safety\",\"Top Stories Today\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/newmobility.news\\\/2023\\\/09\\\/11\\\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/2023\\\/09\\\/11\\\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\\\/\",\"url\":\"https:\\\/\\\/newmobility.news\\\/2023\\\/09\\\/11\\\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\\\/\",\"name\":\"Gotthard tunnel closed due to 25-meter crack in ceiling - newmobility.news\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2023\\\/09\\\/11\\\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2023\\\/09\\\/11\\\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Untitled.png?fit=1460%2C940&ssl=1\",\"datePublished\":\"2023-09-11T09:59:42+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2023\\\/09\\\/11\\\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/newmobility.news\\\/2023\\\/09\\\/11\\\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/2023\\\/09\\\/11\\\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\\\/#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Untitled.png?fit=1460%2C940&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Untitled.png?fit=1460%2C940&ssl=1\",\"width\":1460,\"height\":940,\"caption\":\"Those who will want to drive to Italy via the Gotthard tunnel will have to look out for an alternative. The tunnel is currently closed due to a crack in the ceiling \\\/Gotthard-strassentunnel.ch\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/2023\\\/09\\\/11\\\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/newmobility.news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Gotthard tunnel closed due to 25-meter crack in ceiling\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#website\",\"url\":\"https:\\\/\\\/newmobility.news\\\/\",\"name\":\"newmobility.news\",\"description\":\"A B2BNews Agency\u00ae news service for mobility business proessional\",\"publisher\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/newmobility.news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#organization\",\"name\":\"B2BNews Agency\",\"url\":\"https:\\\/\\\/newmobility.news\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2018\\\/01\\\/b2bnews-agency-logo.png\",\"contentUrl\":\"https:\\\/\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2018\\\/01\\\/b2bnews-agency-logo.png\",\"width\":\"581\",\"height\":\"117\",\"caption\":\"B2BNews Agency\"},\"image\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/search\\\/top\\\/?q=newmobility.news\",\"https:\\\/\\\/x.com\\\/jorisvry\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/jorisvanroy\\\/\",\"https:\\\/\\\/nl.pinterest.com\\\/jorisvanroy\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#\\\/schema\\\/person\\\/a31e684b1039b4a94985a9aae156f28b\",\"name\":\"Luc Joris\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g\",\"caption\":\"Luc Joris\"},\"url\":\"https:\\\/\\\/newmobility.news\\\/en\\\/author\\\/belga-5\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Gotthard tunnel closed due to 25-meter crack in ceiling - newmobility.news","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newmobility.news\/en\/2023\/09\/11\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\/","og_locale":"en_US","og_type":"article","og_title":"Gotthard tunnel closed due to 25-meter crack in ceiling - newmobility.news","og_description":"The Gotthard tunnel, at 16,9 km the longest road tunnel in Switzerland, has been closed since Sunday. The reason is a crack in the ceiling of the tunnel, which is popular with motorists driving to and from Italy. Chunks of concrete landed on the road, but no one was injured, said FEDRO, the Swiss agThis [&hellip;]","og_url":"https:\/\/newmobility.news\/en\/2023\/09\/11\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\/","og_site_name":"newmobility.news","article_publisher":"https:\/\/www.facebook.com\/search\/top\/?q=newmobility.news","article_published_time":"2023-09-11T09:59:42+00:00","og_image":[{"width":1460,"height":940,"url":"https:\/\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png","type":"image\/png"}],"author":"Luc Joris","twitter_card":"summary_large_image","twitter_creator":"@jorisvry","twitter_site":"@jorisvry","twitter_misc":{"Written by":"Luc Joris","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/newmobility.news\/2023\/09\/11\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\/#article","isPartOf":{"@id":"https:\/\/newmobility.news\/2023\/09\/11\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\/"},"author":{"name":"Luc Joris","@id":"https:\/\/newmobility.news\/#\/schema\/person\/a31e684b1039b4a94985a9aae156f28b"},"headline":"Gotthard tunnel closed due to 25-meter crack in ceiling","datePublished":"2023-09-11T09:59:42+00:00","mainEntityOfPage":{"@id":"https:\/\/newmobility.news\/2023\/09\/11\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\/"},"wordCount":220,"commentCount":0,"publisher":{"@id":"https:\/\/newmobility.news\/#organization"},"image":{"@id":"https:\/\/newmobility.news\/2023\/09\/11\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?fit=1460%2C940&ssl=1","articleSection":["Mobility","Public transport","Road safety","Top Stories Today"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/newmobility.news\/2023\/09\/11\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/newmobility.news\/2023\/09\/11\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\/","url":"https:\/\/newmobility.news\/2023\/09\/11\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\/","name":"Gotthard tunnel closed due to 25-meter crack in ceiling - newmobility.news","isPartOf":{"@id":"https:\/\/newmobility.news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newmobility.news\/2023\/09\/11\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\/#primaryimage"},"image":{"@id":"https:\/\/newmobility.news\/2023\/09\/11\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?fit=1460%2C940&ssl=1","datePublished":"2023-09-11T09:59:42+00:00","breadcrumb":{"@id":"https:\/\/newmobility.news\/2023\/09\/11\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newmobility.news\/2023\/09\/11\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/newmobility.news\/2023\/09\/11\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\/#primaryimage","url":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?fit=1460%2C940&ssl=1","contentUrl":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?fit=1460%2C940&ssl=1","width":1460,"height":940,"caption":"Those who will want to drive to Italy via the Gotthard tunnel will have to look out for an alternative. The tunnel is currently closed due to a crack in the ceiling \/Gotthard-strassentunnel.ch"},{"@type":"BreadcrumbList","@id":"https:\/\/newmobility.news\/2023\/09\/11\/gotthard-tunnel-closed-due-to-25-meter-crack-in-ceiling\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/newmobility.news\/"},{"@type":"ListItem","position":2,"name":"Gotthard tunnel closed due to 25-meter crack in ceiling"}]},{"@type":"WebSite","@id":"https:\/\/newmobility.news\/#website","url":"https:\/\/newmobility.news\/","name":"newmobility.news","description":"A B2BNews Agency\u00ae news service for mobility business proessional","publisher":{"@id":"https:\/\/newmobility.news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newmobility.news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/newmobility.news\/#organization","name":"B2BNews Agency","url":"https:\/\/newmobility.news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/newmobility.news\/#\/schema\/logo\/image\/","url":"https:\/\/newmobility.news\/wp-content\/uploads\/2018\/01\/b2bnews-agency-logo.png","contentUrl":"https:\/\/newmobility.news\/wp-content\/uploads\/2018\/01\/b2bnews-agency-logo.png","width":"581","height":"117","caption":"B2BNews Agency"},"image":{"@id":"https:\/\/newmobility.news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/search\/top\/?q=newmobility.news","https:\/\/x.com\/jorisvry","https:\/\/www.linkedin.com\/in\/jorisvanroy\/","https:\/\/nl.pinterest.com\/jorisvanroy\/"]},{"@type":"Person","@id":"https:\/\/newmobility.news\/#\/schema\/person\/a31e684b1039b4a94985a9aae156f28b","name":"Luc Joris","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g","caption":"Luc Joris"},"url":"https:\/\/newmobility.news\/en\/author\/belga-5\/"}]}},"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/09\/Untitled.png?fit=1460%2C940&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p9wJdU-AmD","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack-related-posts":[],"_links":{"self":[{"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/posts\/139787","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/users\/164"}],"replies":[{"embeddable":true,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/comments?post=139787"}],"version-history":[{"count":0,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/posts\/139787\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/media\/139791"}],"wp:attachment":[{"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/media?parent=139787"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/categories?post=139787"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/tags?post=139787"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}