{"id":178864,"date":"2025-12-08T12:10:15","date_gmt":"2025-12-08T11:10:15","guid":{"rendered":"https:\/\/newmobility.news\/?p=178864"},"modified":"2025-12-09T10:36:50","modified_gmt":"2025-12-09T09:36:50","slug":"brussels-test-drills-maximilian-park-for-a-heating-network","status":"publish","type":"post","link":"https:\/\/newmobility.news\/en\/2025\/12\/08\/brussels-test-drills-maximilian-park-for-a-heating-network\/","title":{"rendered":"Brussels begins test-drilling in Maximilian Park for heating network"},"content":{"rendered":"<p>In the future, Brussels' Maximilian Park will also serve as a source of heating and cooling for the surrounding buildings. Test drilling will begin today as part of the park's energy transition in the North District.<\/p><p>Be.SHARE, a project for a low-temperature network, aims to drastically reduce CO2 emissions in the district by replacing fossil fuels with local renewable energy sources, such as geothermal energy, heat recovery from public spaces, and sewer heat recovery, which recovers heat from wastewater flowing through the sewers.<\/p><div class=\"leaky_paywall_message_wrap\"><div id=\"leaky_paywall_message\">This content has been archived. <a href=\"https:\/\/newmobility.news\/en\/subscription\/\">Log in or Subscribe<\/a> to a level that has access to archived content.<\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>In the future, Brussels&#8217; Maximilian Park will also serve as a source of heating and cooling for the surrounding buildings. Test drilling will begin today as part of the park&#8217;s energy transition in the North District.Be.SHARE, a project for a low-temperature network, aims to drastically reduce CO2 emissions in the district by replacing fossil fuels [&hellip;]<\/p>\n","protected":false},"author":164,"featured_media":178879,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"{title}\n\n{excerpt}\n\n{url}","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"_wpas_customize_per_network":false,"jetpack_post_was_ever_published":false},"categories":[77170,14496,2043,29,28,6],"tags":[],"class_list":["post-178864","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-belgium","category-climate","category-energy","category-environment","category-europe","category-technology"],"acf":[],"featured_image_urls_v2":{"full":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?fit=2560%2C1342&ssl=1",2560,1342,false],"thumbnail":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?resize=150%2C150&ssl=1",150,150,true],"medium":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?fit=300%2C157&ssl=1",300,157,true],"medium_large":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?fit=640%2C336&ssl=1",640,336,true],"large":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?fit=640%2C336&ssl=1",640,336,true],"1536x1536":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?fit=1536%2C805&ssl=1",1536,805,true],"2048x2048":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?fit=2048%2C1073&ssl=1",2048,1073,true],"trp-custom-language-flag":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?fit=18%2C9&ssl=1",18,9,true],"related-thumb":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?resize=640%2C480&ssl=1",640,480,true],"gform-image-choice-sm":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?resize=300%2C300&ssl=1",300,300,true],"gform-image-choice-md":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?resize=400%2C400&ssl=1",400,400,true],"gform-image-choice-lg":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?resize=600%2C600&ssl=1",600,600,true],"mailchimp":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?fit=560%2C294&ssl=1",560,294,true],"unipress-phone":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?resize=640%2C100&ssl=1",640,100,true],"unipress-tablet":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?resize=1536%2C240&ssl=1",1536,240,true],"unipress-tablet-portrait":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?resize=1536%2C180&ssl=1",1536,180,true],"unipress-tablet-landscape":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?resize=2048%2C180&ssl=1",2048,180,true],"unipress-smartphone":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?resize=1080%2C168&ssl=1",1080,168,true],"unipress-wide-screen":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?resize=2560%2C180&ssl=1",2560,180,true]},"post_excerpt_stackable_v2":"<p>In the future, Brussels&#8217; Maximilian Park will also serve as a source of heating and cooling for the surrounding buildings. Test drilling will begin today as part of the park&#8217;s energy transition in the North District.Be.SHARE, a project for a low-temperature network, aims to drastically reduce CO2 emissions in the district by replacing fossil fuels with local renewable energy sources, such as geothermal energy, heat recovery from public spaces, and sewer heat recovery, which recovers heat from wastewater flowing through the sewers.This content has been archived. Log in or Subscribe to a level that has access to archived content.<\/p>\n","category_list_v2":"<a href=\"https:\/\/newmobility.news\/en\/category\/belgium\/\" rel=\"category tag\">Belgium<\/a>, <a href=\"https:\/\/newmobility.news\/en\/category\/climate\/\" rel=\"category tag\">Climate<\/a>, <a href=\"https:\/\/newmobility.news\/en\/category\/energy\/\" rel=\"category tag\">Energy<\/a>, <a href=\"https:\/\/newmobility.news\/en\/category\/environment\/\" rel=\"category tag\">Environment<\/a>, <a href=\"https:\/\/newmobility.news\/en\/category\/europe\/\" rel=\"category tag\">Europe<\/a>, <a href=\"https:\/\/newmobility.news\/en\/category\/technology\/\" rel=\"category tag\">Technology<\/a>","author_info_v2":{"name":"Luc Joris","url":"https:\/\/newmobility.news\/en\/author\/belga-5\/"},"comments_num_v2":"0 comments","yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Brussels begins test-drilling in Maximilian Park for heating network - newmobility.news<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newmobility.news\/en\/2025\/12\/08\/brussels-test-drills-maximilian-park-for-a-heating-network\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Brussels begins test-drilling in Maximilian Park for heating network - newmobility.news\" \/>\n<meta property=\"og:description\" content=\"In the future, Brussels&#039; Maximilian Park will also serve as a source of heating and cooling for the surrounding buildings. Test drilling will begin today as part of the park&#039;s energy transition in the North District.Be.SHARE, a project for a low-temperature network, aims to drastically reduce CO2 emissions in the district by replacing fossil fuels [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newmobility.news\/en\/2025\/12\/08\/brussels-test-drills-maximilian-park-for-a-heating-network\/\" \/>\n<meta property=\"og:site_name\" content=\"newmobility.news\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/search\/top\/?q=newmobility.news\" \/>\n<meta property=\"article:published_time\" content=\"2025-12-08T11:10:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-09T09:36:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1342\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Luc Joris\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@jorisvry\" \/>\n<meta name=\"twitter:site\" content=\"@jorisvry\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Luc Joris\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/2025\\\/12\\\/08\\\/brussels-test-drills-maximilian-park-for-a-heating-network\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2025\\\/12\\\/08\\\/brussels-test-drills-maximilian-park-for-a-heating-network\\\/\"},\"author\":{\"name\":\"Luc Joris\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#\\\/schema\\\/person\\\/9b4a04002179d83e5be74f13c664b722\"},\"headline\":\"Brussels begins test-drilling in Maximilian Park for heating network\",\"datePublished\":\"2025-12-08T11:10:15+00:00\",\"dateModified\":\"2025-12-09T09:36:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2025\\\/12\\\/08\\\/brussels-test-drills-maximilian-park-for-a-heating-network\\\/\"},\"wordCount\":481,\"publisher\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2025\\\/12\\\/08\\\/brussels-test-drills-maximilian-park-for-a-heating-network\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/Untitled-2777-scaled.png?fit=2560%2C1342&ssl=1\",\"articleSection\":[\"Belgium\",\"Climate\",\"Energy\",\"Environment\",\"Europe\",\"Technology\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/2025\\\/12\\\/08\\\/brussels-test-drills-maximilian-park-for-a-heating-network\\\/\",\"url\":\"https:\\\/\\\/newmobility.news\\\/2025\\\/12\\\/08\\\/brussels-test-drills-maximilian-park-for-a-heating-network\\\/\",\"name\":\"Brussels begins test-drilling in Maximilian Park for heating network - newmobility.news\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2025\\\/12\\\/08\\\/brussels-test-drills-maximilian-park-for-a-heating-network\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2025\\\/12\\\/08\\\/brussels-test-drills-maximilian-park-for-a-heating-network\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/Untitled-2777-scaled.png?fit=2560%2C1342&ssl=1\",\"datePublished\":\"2025-12-08T11:10:15+00:00\",\"dateModified\":\"2025-12-09T09:36:50+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2025\\\/12\\\/08\\\/brussels-test-drills-maximilian-park-for-a-heating-network\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/newmobility.news\\\/2025\\\/12\\\/08\\\/brussels-test-drills-maximilian-park-for-a-heating-network\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/2025\\\/12\\\/08\\\/brussels-test-drills-maximilian-park-for-a-heating-network\\\/#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/Untitled-2777-scaled.png?fit=2560%2C1342&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/Untitled-2777-scaled.png?fit=2560%2C1342&ssl=1\",\"width\":2560,\"height\":1342,\"caption\":\"A low-temperature network project has been launched in the Brussels North district. It is a first in the Brussels Region \\\/Brussels Environment\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/2025\\\/12\\\/08\\\/brussels-test-drills-maximilian-park-for-a-heating-network\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/newmobility.news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Brussels begins test-drilling in Maximilian Park for heating network\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#website\",\"url\":\"https:\\\/\\\/newmobility.news\\\/\",\"name\":\"newmobility.news\",\"description\":\"A B2BNews Agency\u00ae news service for mobility business proessional\",\"publisher\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/newmobility.news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#organization\",\"name\":\"B2BNews Agency\",\"url\":\"https:\\\/\\\/newmobility.news\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2018\\\/01\\\/b2bnews-agency-logo.png\",\"contentUrl\":\"https:\\\/\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2018\\\/01\\\/b2bnews-agency-logo.png\",\"width\":\"581\",\"height\":\"117\",\"caption\":\"B2BNews Agency\"},\"image\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/search\\\/top\\\/?q=newmobility.news\",\"https:\\\/\\\/x.com\\\/jorisvry\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/jorisvanroy\\\/\",\"https:\\\/\\\/nl.pinterest.com\\\/jorisvanroy\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#\\\/schema\\\/person\\\/9b4a04002179d83e5be74f13c664b722\",\"name\":\"Luc Joris\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g\",\"caption\":\"Luc Joris\"},\"url\":\"https:\\\/\\\/newmobility.news\\\/en\\\/author\\\/belga-5\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Brussels begins test-drilling in Maximilian Park for heating network - newmobility.news","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newmobility.news\/en\/2025\/12\/08\/brussels-test-drills-maximilian-park-for-a-heating-network\/","og_locale":"en_US","og_type":"article","og_title":"Brussels begins test-drilling in Maximilian Park for heating network - newmobility.news","og_description":"In the future, Brussels' Maximilian Park will also serve as a source of heating and cooling for the surrounding buildings. Test drilling will begin today as part of the park's energy transition in the North District.Be.SHARE, a project for a low-temperature network, aims to drastically reduce CO2 emissions in the district by replacing fossil fuels [&hellip;]","og_url":"https:\/\/newmobility.news\/en\/2025\/12\/08\/brussels-test-drills-maximilian-park-for-a-heating-network\/","og_site_name":"newmobility.news","article_publisher":"https:\/\/www.facebook.com\/search\/top\/?q=newmobility.news","article_published_time":"2025-12-08T11:10:15+00:00","article_modified_time":"2025-12-09T09:36:50+00:00","og_image":[{"width":2560,"height":1342,"url":"https:\/\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png","type":"image\/png"}],"author":"Luc Joris","twitter_card":"summary_large_image","twitter_creator":"@jorisvry","twitter_site":"@jorisvry","twitter_misc":{"Written by":"Luc Joris","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/newmobility.news\/2025\/12\/08\/brussels-test-drills-maximilian-park-for-a-heating-network\/#article","isPartOf":{"@id":"https:\/\/newmobility.news\/2025\/12\/08\/brussels-test-drills-maximilian-park-for-a-heating-network\/"},"author":{"name":"Luc Joris","@id":"https:\/\/newmobility.news\/#\/schema\/person\/9b4a04002179d83e5be74f13c664b722"},"headline":"Brussels begins test-drilling in Maximilian Park for heating network","datePublished":"2025-12-08T11:10:15+00:00","dateModified":"2025-12-09T09:36:50+00:00","mainEntityOfPage":{"@id":"https:\/\/newmobility.news\/2025\/12\/08\/brussels-test-drills-maximilian-park-for-a-heating-network\/"},"wordCount":481,"publisher":{"@id":"https:\/\/newmobility.news\/#organization"},"image":{"@id":"https:\/\/newmobility.news\/2025\/12\/08\/brussels-test-drills-maximilian-park-for-a-heating-network\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?fit=2560%2C1342&ssl=1","articleSection":["Belgium","Climate","Energy","Environment","Europe","Technology"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/newmobility.news\/2025\/12\/08\/brussels-test-drills-maximilian-park-for-a-heating-network\/","url":"https:\/\/newmobility.news\/2025\/12\/08\/brussels-test-drills-maximilian-park-for-a-heating-network\/","name":"Brussels begins test-drilling in Maximilian Park for heating network - newmobility.news","isPartOf":{"@id":"https:\/\/newmobility.news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newmobility.news\/2025\/12\/08\/brussels-test-drills-maximilian-park-for-a-heating-network\/#primaryimage"},"image":{"@id":"https:\/\/newmobility.news\/2025\/12\/08\/brussels-test-drills-maximilian-park-for-a-heating-network\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?fit=2560%2C1342&ssl=1","datePublished":"2025-12-08T11:10:15+00:00","dateModified":"2025-12-09T09:36:50+00:00","breadcrumb":{"@id":"https:\/\/newmobility.news\/2025\/12\/08\/brussels-test-drills-maximilian-park-for-a-heating-network\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newmobility.news\/2025\/12\/08\/brussels-test-drills-maximilian-park-for-a-heating-network\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/newmobility.news\/2025\/12\/08\/brussels-test-drills-maximilian-park-for-a-heating-network\/#primaryimage","url":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?fit=2560%2C1342&ssl=1","contentUrl":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?fit=2560%2C1342&ssl=1","width":2560,"height":1342,"caption":"A low-temperature network project has been launched in the Brussels North district. It is a first in the Brussels Region \/Brussels Environment"},{"@type":"BreadcrumbList","@id":"https:\/\/newmobility.news\/2025\/12\/08\/brussels-test-drills-maximilian-park-for-a-heating-network\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/newmobility.news\/"},{"@type":"ListItem","position":2,"name":"Brussels begins test-drilling in Maximilian Park for heating network"}]},{"@type":"WebSite","@id":"https:\/\/newmobility.news\/#website","url":"https:\/\/newmobility.news\/","name":"newmobility.news","description":"A B2BNews Agency\u00ae news service for mobility business proessional","publisher":{"@id":"https:\/\/newmobility.news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newmobility.news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/newmobility.news\/#organization","name":"B2BNews Agency","url":"https:\/\/newmobility.news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/newmobility.news\/#\/schema\/logo\/image\/","url":"https:\/\/newmobility.news\/wp-content\/uploads\/2018\/01\/b2bnews-agency-logo.png","contentUrl":"https:\/\/newmobility.news\/wp-content\/uploads\/2018\/01\/b2bnews-agency-logo.png","width":"581","height":"117","caption":"B2BNews Agency"},"image":{"@id":"https:\/\/newmobility.news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/search\/top\/?q=newmobility.news","https:\/\/x.com\/jorisvry","https:\/\/www.linkedin.com\/in\/jorisvanroy\/","https:\/\/nl.pinterest.com\/jorisvanroy\/"]},{"@type":"Person","@id":"https:\/\/newmobility.news\/#\/schema\/person\/9b4a04002179d83e5be74f13c664b722","name":"Luc Joris","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g","caption":"Luc Joris"},"url":"https:\/\/newmobility.news\/en\/author\/belga-5\/"}]}},"jetpack_publicize_connections":[],"jetpack_shortlink":"https:\/\/wp.me\/p9wJdU-KwU","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack-related-posts":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2025\/12\/Untitled-2777-scaled.png?fit=2560%2C1342&ssl=1","_links":{"self":[{"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/posts\/178864","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/users\/164"}],"replies":[{"embeddable":true,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/comments?post=178864"}],"version-history":[{"count":10,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/posts\/178864\/revisions"}],"predecessor-version":[{"id":178941,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/posts\/178864\/revisions\/178941"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/media\/178879"}],"wp:attachment":[{"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/media?parent=178864"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/categories?post=178864"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/tags?post=178864"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}