{"id":187386,"date":"2026-06-08T12:15:26","date_gmt":"2026-06-08T10:15:26","guid":{"rendered":"https:\/\/newmobility.news\/?p=187386"},"modified":"2026-06-08T11:53:29","modified_gmt":"2026-06-08T09:53:29","slug":"flemish-tram-network-creaks-under-years-of-deferred-maintenance","status":"publish","type":"post","link":"https:\/\/newmobility.news\/en\/2026\/06\/08\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\/","title":{"rendered":"Flemish tram network creaks under years of deferred maintenance"},"content":{"rendered":"<p>More than <span class=\"Y2IQFc\" lang=\"en\">half (53%) of the tram tracks in Flanders are in &#8220;poor to very poor&#8221; condition: 230 km of tram track are in bad or very bad condition (127 km in bad condition and 103 km in very bad condition). <\/span><span class=\"Y2IQFc\" lang=\"en\">This is evident from figures released by the public transport company De Lijn on Friday. The total Flemish tram-track base is roughly\u00a0434 km.\u00a0<\/span><\/p>\n<p>De Lijn says it renews \u201ca little over 20 km\u201d per year, or about\u00a04.7% of the network. At that rhythm, the existing bad\/very bad stock alone would take about 11 to 12 years to clear \u2014 and that assumes no other track deteriorates in the meantime.<\/p>\n<h4>Far too little maintenance<\/h4>\n<p><span class=\"Y2IQFc\" lang=\"en\">Tram tracks last about twenty years on average, but in Flanders, trams run on tracks that are up to 40 years old. In some places, the risk is already too high to continue operating, says Ann Schoubs, Director General of public transport company De Lijn. &#8220;<\/span><span class=\"Y2IQFc\" lang=\"en\">Far too little has been invested in the tram rail network in recent years.&#8221;<\/span><\/p>\n<p><span class=\"Y2IQFc\" lang=\"en\">Repairing tram tracks is expensive: renovating 5 percent of the network would cost 75 million euros.<\/span><\/p>\n<p><strong>Dramatic<\/strong><\/p>\n<p><span class=\"Y2IQFc\" lang=\"en\">In Antwerp, the situation is dramatic, and repair work is underway almost everywhere at once, out of necessity. An official Flemish parliamentary answer says tram lines 2 and 4 have not run through to Hoboken Lelieplaats since July 2023, with a shuttle bus replacing the Zwaantjes-Lelieplaats section.<\/span><\/p>\n<p><span class=\"Y2IQFc\" lang=\"en\">The timing of all those repair works could hardly have been worse. When every car user is getting stuck in the Oosterweel works, public transport should be the alternative. <\/span><span class=\"Y2IQFc\" lang=\"en\">But that doesn&#8217;t seem to be working out entirely. However, the alternatives to the metro tunnel do seem to offer some relief for the time being.<\/span><\/p>\n<h4>Other cities<\/h4>\n<p>Other Flemish cities also have tram track problems. In Ghent, for example, 40-year-old tracks had already caused vibration, loosening, and street-surface problems, and one curve was so worn that trams had stopped running there years earlier.<\/p>\n<p>Brussels appears to be in a\u00a0better renewal rhythm, although there is no perfectly comparable public &#8216;bad\/very bad track&#8217; figure. STIB\/MIVB says Brussels has about\u00a0150 km of tram network and renews about 6.7 to 10% of the network per year.<\/p>\n<p>Brussels also has a major capital program backed by the European Investment Bank: a \u20ac475 million loan for new electric buses, trams, and metro trains, as well as the renewal of 63 km of tram and metro tracks. That does not prove Brussels has no backlog, but it does show a large, structured reinvestment program.<\/p>\n<h4>Neighboring countries<\/h4>\n<p>In the neighboring European countries, the situation seems to be more under control. Amsterdam\u2019s tram and metro infrastructure, for instance, is managed with condition-based maintenance over about 224 km of tram track\u00a0and\u00a0110 km of metro track.<\/p>\n<p>For Germany, Berlin\u2019s BVG tram network is much larger \u2013 about 320 km \u2013 and BVG has recently framed its public-transport strategy as &#8216;stability over growth&#8217; after years of expansion and pressure on the system.<\/p>\n<p>And in Luxembourg, the modern tram system is young: the completed line to the airport brought it to about\u00a016.4 km and 24 stops.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>More than half (53%) of the tram tracks in Flanders are in &#8220;poor to very poor&#8221; condition: 230 km of tram track are in bad or very bad condition (127 km in bad condition and 103 km in very bad condition). This is evident from figures released by the public transport company De Lijn on [&hellip;]<\/p>\n","protected":false},"author":175,"featured_media":187401,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"_wpas_customize_per_network":false,"jetpack_post_was_ever_published":false},"categories":[77170,7,26,4],"tags":[],"class_list":["post-187386","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-belgium","category-mobility","category-public-transport","category-top-stories-today"],"acf":[],"featured_image_urls_v2":{"full":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?fit=836%2C581&ssl=1",836,581,false],"thumbnail":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?resize=150%2C150&ssl=1",150,150,true],"medium":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?fit=300%2C208&ssl=1",300,208,true],"medium_large":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?fit=640%2C445&ssl=1",640,445,true],"large":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?fit=640%2C445&ssl=1",640,445,true],"1536x1536":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?fit=836%2C581&ssl=1",836,581,true],"2048x2048":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?fit=836%2C581&ssl=1",836,581,true],"trp-custom-language-flag":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?fit=18%2C12&ssl=1",18,12,true],"related-thumb":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?resize=640%2C480&ssl=1",640,480,true],"gform-image-choice-sm":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?resize=300%2C300&ssl=1",300,300,true],"gform-image-choice-md":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?resize=400%2C400&ssl=1",400,400,true],"gform-image-choice-lg":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?resize=600%2C581&ssl=1",600,581,true],"mailchimp":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?fit=560%2C389&ssl=1",560,389,true],"unipress-phone":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?resize=640%2C100&ssl=1",640,100,true],"unipress-tablet":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?resize=836%2C240&ssl=1",836,240,true],"unipress-tablet-portrait":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?resize=836%2C180&ssl=1",836,180,true],"unipress-tablet-landscape":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?resize=836%2C180&ssl=1",836,180,true],"unipress-smartphone":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?resize=836%2C168&ssl=1",836,168,true],"unipress-wide-screen":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?resize=836%2C180&ssl=1",836,180,true]},"post_excerpt_stackable_v2":"<p>More than half (53%) of the tram tracks in Flanders are in &#8220;poor to very poor&#8221; condition: 230 km of tram track are in bad or very bad condition (127 km in bad condition and 103 km in very bad condition). This is evident from figures released by the public transport company De Lijn on Friday. The total Flemish tram-track base is roughly\u00a0434 km.\u00a0 De Lijn says it renews \u201ca little over 20 km\u201d per year, or about\u00a04.7% of the network. At that rhythm, the existing bad\/very bad stock alone would take about 11 to 12 years to clear \u2014&hellip;<\/p>\n","category_list_v2":"<a href=\"https:\/\/newmobility.news\/en\/category\/belgium\/\" rel=\"category tag\">Belgium<\/a>, <a href=\"https:\/\/newmobility.news\/en\/category\/mobility\/\" rel=\"category tag\">Mobility<\/a>, <a href=\"https:\/\/newmobility.news\/en\/category\/public-transport\/\" rel=\"category tag\">Public transport<\/a>, <a href=\"https:\/\/newmobility.news\/en\/category\/top-stories-today\/\" rel=\"category tag\">Top Stories Today<\/a>","author_info_v2":{"name":"Hilde Van Raemdonck","url":"https:\/\/newmobility.news\/en\/author\/hilde-van-raemdonck\/"},"comments_num_v2":"0 comments","yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Flemish tram network creaks under years of deferred maintenance - newmobility.news<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newmobility.news\/en\/2026\/06\/08\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Flemish tram network creaks under years of deferred maintenance - newmobility.news\" \/>\n<meta property=\"og:description\" content=\"More than half (53%) of the tram tracks in Flanders are in &#8220;poor to very poor&#8221; condition: 230 km of tram track are in bad or very bad condition (127 km in bad condition and 103 km in very bad condition). This is evident from figures released by the public transport company De Lijn on [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newmobility.news\/en\/2026\/06\/08\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\/\" \/>\n<meta property=\"og:site_name\" content=\"newmobility.news\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/search\/top\/?q=newmobility.news\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-08T10:15:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?fit=836%2C581&ssl=1\" \/>\n\t<meta property=\"og:image:width\" content=\"836\" \/>\n\t<meta property=\"og:image:height\" content=\"581\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Hilde Van Raemdonck\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@jorisvry\" \/>\n<meta name=\"twitter:site\" content=\"@jorisvry\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Hilde Van Raemdonck\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/06\\\/08\\\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/06\\\/08\\\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\\\/\"},\"author\":{\"name\":\"Hilde Van Raemdonck\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#\\\/schema\\\/person\\\/e57c278780b041b8d42f2ce28dd9ec82\"},\"headline\":\"Flemish tram network creaks under years of deferred maintenance\",\"datePublished\":\"2026-06-08T10:15:26+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/06\\\/08\\\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\\\/\"},\"wordCount\":514,\"publisher\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/06\\\/08\\\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?fit=836%2C581&ssl=1\",\"articleSection\":[\"Belgium\",\"Mobility\",\"Public transport\",\"Top Stories Today\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/06\\\/08\\\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\\\/\",\"url\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/06\\\/08\\\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\\\/\",\"name\":\"Flemish tram network creaks under years of deferred maintenance - newmobility.news\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/06\\\/08\\\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/06\\\/08\\\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?fit=836%2C581&ssl=1\",\"datePublished\":\"2026-06-08T10:15:26+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/06\\\/08\\\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/newmobility.news\\\/2026\\\/06\\\/08\\\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/06\\\/08\\\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\\\/#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?fit=836%2C581&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?fit=836%2C581&ssl=1\",\"width\":836,\"height\":581,\"caption\":\"Repairing tram tracks is expensive: to renovate 5 percent of the network, 75 million euros are needed \\\/denys.com\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/06\\\/08\\\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/newmobility.news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Flemish tram network creaks under years of deferred maintenance\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#website\",\"url\":\"https:\\\/\\\/newmobility.news\\\/\",\"name\":\"newmobility.news\",\"description\":\"A B2BNews Agency\u00ae news service for mobility business proessional\",\"publisher\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/newmobility.news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#organization\",\"name\":\"B2BNews Agency\",\"url\":\"https:\\\/\\\/newmobility.news\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2018\\\/01\\\/b2bnews-agency-logo.png\",\"contentUrl\":\"https:\\\/\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2018\\\/01\\\/b2bnews-agency-logo.png\",\"width\":\"581\",\"height\":\"117\",\"caption\":\"B2BNews Agency\"},\"image\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/search\\\/top\\\/?q=newmobility.news\",\"https:\\\/\\\/x.com\\\/jorisvry\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/jorisvanroy\\\/\",\"https:\\\/\\\/nl.pinterest.com\\\/jorisvanroy\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#\\\/schema\\\/person\\\/e57c278780b041b8d42f2ce28dd9ec82\",\"name\":\"Hilde Van Raemdonck\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/df873a81c6773757375a21da8c2465de0552095dede94d299763768ab1b36cef?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/df873a81c6773757375a21da8c2465de0552095dede94d299763768ab1b36cef?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/df873a81c6773757375a21da8c2465de0552095dede94d299763768ab1b36cef?s=96&d=mm&r=g\",\"caption\":\"Hilde Van Raemdonck\"},\"url\":\"https:\\\/\\\/newmobility.news\\\/en\\\/author\\\/hilde-van-raemdonck\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Flemish tram network creaks under years of deferred maintenance - newmobility.news","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newmobility.news\/en\/2026\/06\/08\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\/","og_locale":"en_US","og_type":"article","og_title":"Flemish tram network creaks under years of deferred maintenance - newmobility.news","og_description":"More than half (53%) of the tram tracks in Flanders are in &#8220;poor to very poor&#8221; condition: 230 km of tram track are in bad or very bad condition (127 km in bad condition and 103 km in very bad condition). This is evident from figures released by the public transport company De Lijn on [&hellip;]","og_url":"https:\/\/newmobility.news\/en\/2026\/06\/08\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\/","og_site_name":"newmobility.news","article_publisher":"https:\/\/www.facebook.com\/search\/top\/?q=newmobility.news","article_published_time":"2026-06-08T10:15:26+00:00","og_image":[{"width":836,"height":581,"url":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?fit=836%2C581&ssl=1","type":"image\/png"}],"author":"Hilde Van Raemdonck","twitter_card":"summary_large_image","twitter_creator":"@jorisvry","twitter_site":"@jorisvry","twitter_misc":{"Written by":"Hilde Van Raemdonck","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/newmobility.news\/2026\/06\/08\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\/#article","isPartOf":{"@id":"https:\/\/newmobility.news\/2026\/06\/08\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\/"},"author":{"name":"Hilde Van Raemdonck","@id":"https:\/\/newmobility.news\/#\/schema\/person\/e57c278780b041b8d42f2ce28dd9ec82"},"headline":"Flemish tram network creaks under years of deferred maintenance","datePublished":"2026-06-08T10:15:26+00:00","mainEntityOfPage":{"@id":"https:\/\/newmobility.news\/2026\/06\/08\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\/"},"wordCount":514,"publisher":{"@id":"https:\/\/newmobility.news\/#organization"},"image":{"@id":"https:\/\/newmobility.news\/2026\/06\/08\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?fit=836%2C581&ssl=1","articleSection":["Belgium","Mobility","Public transport","Top Stories Today"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/newmobility.news\/2026\/06\/08\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\/","url":"https:\/\/newmobility.news\/2026\/06\/08\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\/","name":"Flemish tram network creaks under years of deferred maintenance - newmobility.news","isPartOf":{"@id":"https:\/\/newmobility.news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newmobility.news\/2026\/06\/08\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\/#primaryimage"},"image":{"@id":"https:\/\/newmobility.news\/2026\/06\/08\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?fit=836%2C581&ssl=1","datePublished":"2026-06-08T10:15:26+00:00","breadcrumb":{"@id":"https:\/\/newmobility.news\/2026\/06\/08\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newmobility.news\/2026\/06\/08\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/newmobility.news\/2026\/06\/08\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\/#primaryimage","url":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?fit=836%2C581&ssl=1","contentUrl":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?fit=836%2C581&ssl=1","width":836,"height":581,"caption":"Repairing tram tracks is expensive: to renovate 5 percent of the network, 75 million euros are needed \/denys.com"},{"@type":"BreadcrumbList","@id":"https:\/\/newmobility.news\/2026\/06\/08\/flemish-tram-network-creaks-under-years-of-deferred-maintenance\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/newmobility.news\/"},{"@type":"ListItem","position":2,"name":"Flemish tram network creaks under years of deferred maintenance"}]},{"@type":"WebSite","@id":"https:\/\/newmobility.news\/#website","url":"https:\/\/newmobility.news\/","name":"newmobility.news","description":"A B2BNews Agency\u00ae news service for mobility business proessional","publisher":{"@id":"https:\/\/newmobility.news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newmobility.news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/newmobility.news\/#organization","name":"B2BNews Agency","url":"https:\/\/newmobility.news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/newmobility.news\/#\/schema\/logo\/image\/","url":"https:\/\/newmobility.news\/wp-content\/uploads\/2018\/01\/b2bnews-agency-logo.png","contentUrl":"https:\/\/newmobility.news\/wp-content\/uploads\/2018\/01\/b2bnews-agency-logo.png","width":"581","height":"117","caption":"B2BNews Agency"},"image":{"@id":"https:\/\/newmobility.news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/search\/top\/?q=newmobility.news","https:\/\/x.com\/jorisvry","https:\/\/www.linkedin.com\/in\/jorisvanroy\/","https:\/\/nl.pinterest.com\/jorisvanroy\/"]},{"@type":"Person","@id":"https:\/\/newmobility.news\/#\/schema\/person\/e57c278780b041b8d42f2ce28dd9ec82","name":"Hilde Van Raemdonck","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/df873a81c6773757375a21da8c2465de0552095dede94d299763768ab1b36cef?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/df873a81c6773757375a21da8c2465de0552095dede94d299763768ab1b36cef?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/df873a81c6773757375a21da8c2465de0552095dede94d299763768ab1b36cef?s=96&d=mm&r=g","caption":"Hilde Van Raemdonck"},"url":"https:\/\/newmobility.news\/en\/author\/hilde-van-raemdonck\/"}]}},"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/06\/Scherm%C2%ADafbeelding-2026-06-08-om-11.35.49.png?fit=836%2C581&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p9wJdU-MKm","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack-related-posts":[],"_links":{"self":[{"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/posts\/187386","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/users\/175"}],"replies":[{"embeddable":true,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/comments?post=187386"}],"version-history":[{"count":2,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/posts\/187386\/revisions"}],"predecessor-version":[{"id":187411,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/posts\/187386\/revisions\/187411"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/media\/187401"}],"wp:attachment":[{"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/media?parent=187386"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/categories?post=187386"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/tags?post=187386"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}