{"id":190527,"date":"2026-07-30T12:15:43","date_gmt":"2026-07-30T10:15:43","guid":{"rendered":"https:\/\/newmobility.news\/?p=190527"},"modified":"2026-07-30T11:30:58","modified_gmt":"2026-07-30T09:30:58","slug":"no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now","status":"publish","type":"post","link":"https:\/\/newmobility.news\/en\/2026\/07\/30\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\/","title":{"rendered":"No tram tunnel for Brussels Meiser Square, at least for now"},"content":{"rendered":"<p>In mid-July, the new Brussels Council of Ministers formally gave the green light to the redevelopment of General Meiser Square in Schaerbeek, popularly known as Misery Square.\u00a0The original plan was to begin the redevelopment in the spring of 2025, but the current goal is to start construction by the summer of 2027.<\/p>\n<p>For a long time, there were plans for a combination of a tram tunnel and a car tunnel under the square. However, the car tunnel was scrapped because it was too expensive.<\/p>\n<p>Plans to run tram line 7 specifically under the square itself have now also been put on hold due to the cost of nearly 200 million euros plus ongoing maintenance costs, combined with the Region&#8217;s difficult financial situation.<\/p>\n<h4>Multimodal hub<\/h4>\n<p>Specifically, the well-known, or infamous, roundabout \u2013 a complex, chaotic intersection \u2013 will be removed to make way for two separate intersections: one from the Reyers Avenue-Whahis Avenue corridor, and one for traffic from Cambier Street, Rogier Avenue, Louvain Road, and Plasky Avenue.<\/p>\n<figure id=\"attachment_136932\" aria-describedby=\"caption-attachment-136932\" style=\"width: 640px\" class=\"wp-caption aligncenter\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-136932\" src=\"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/07\/230628-Meiser-vue1.jpg?resize=640%2C427&#038;ssl=1\" alt=\"\" width=\"640\" height=\"427\" srcset=\"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/07\/230628-Meiser-vue1.jpg?resize=1024%2C683&amp;ssl=1 1024w, https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/07\/230628-Meiser-vue1.jpg?w=1280&amp;ssl=1 1280w, https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2023\/07\/230628-Meiser-vue1.jpg?w=1920&amp;ssl=1 1920w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><figcaption id=\"caption-attachment-136932\" class=\"wp-caption-text\">The large roundabout on Meiser Square in Brussels, currently regarded as a black spot in the capital&#8217;s mobility, will be redesigned by creating two separate junctions \/Brussels Mobility<\/figcaption><\/figure>\n<p>The diagonal crossing of the square created by the tram track will also be removed, simplifying the management of the stops. The square is set to become a true multimodal hub, connected to the Meiser NMBS\/SNCB station, with wider, safer pedestrian and cycling spaces, as well as more greenery and trees.<\/p>\n<h4>Difficult financial situation<\/h4>\n<p>The specifications for the current reconstruction project will be published shortly, so many technical details have not yet been made public, but it is already clear that the plan for a tunnel specifically intended for Tram 7 \u2013 or the Big Ring Tram \u2013 including an underground tram station, has been put on hold.<\/p>\n<p>Earlier plans for tunnels 3 stories deep for both trams and cars have also been scrapped due to the enormous cost and construction time, more than 15 years.<\/p>\n<p>Such an underground tram tunnel would greatly speed up tram traffic at Meiser Square, but for now, it won&#8217;t be built. &#8220;According to the latest estimates, it will cost close to 200 million euros to build a tram tunnel under Meiser Square,&#8221; says the office of Brussels Minister of Mobility Elke Van den Brandt (Groen) in La Derni\u00e8re Heure, referring to the current financial difficulties facing the Brussels-Capital Region.<\/p>\n<p>That is not to say that plans for a streetcar tunnel have been definitively shelved. &#8220;The current redevelopment project leaves open the possibility of building a tunnel in the future, which will have to be seriously considered once regional finances allow for it again,&#8221; emphasizes Elke Van den Brandt.<\/p>\n<h4>&#8216;Low-cost&#8217; solution<\/h4>\n<p>The &#8216;low-cost&#8217; solution now being implemented, with an estimated cost of 6 million euros, involves providing the trams with a clearly separated dedicated track at street level to reduce conflicts with car traffic.<\/p>\n<p>In fact, some mobility experts point out that while a tunnel at a single intersection may speed up tram service locally, it does not solve the problem elsewhere in the network, and that well-designed traffic lights and dedicated tram lanes can often deliver a significant portion of the benefits at a fraction of the cost.<\/p>\n<p>On the other hand, a tram that does not conflict with car traffic, pedestrians, or cyclists travels faster and experiences fewer delays. In contrast, an underground tram can more easily handle higher frequencies, which is important if public transportation in that area is to grow.<\/p>\n<h4>Future Mediatram<\/h4>\n<p>And that may be where the problem lies. The nearby Mediapark plan aims to redevelop the Reyers site, with 20,000 m\u00b2 of media-related activities, some 1,400 residential units, retail spaces, and community facilities, all centered around a new park spanning nearly 10 hectares.<\/p>\n<p>There are also plans for a &#8216;Mediatram&#8217;, an extension\/branch of tram line 25, and the route that would link the North Station via Meiser to the Cora Shop in Woluwe, had already been approved by the previous Brussels government.<\/p>\n<p>But that tram project \u2013 to be clear: the current reconstruction plans already take the Mediatram branch line into account \u2013 has now also been put on the back burner by the new government until the next term of office&#8230;<\/p>\n<p>In any case, with projects such as Metro Line 3, which won&#8217;t be completed for years, and Meiser Square, which won&#8217;t start until 2027 at the earliest, the feeling that Brussels, including the Ring Road, is one big road construction site is likely to persist for some time to come.<\/p>\n<p>Hopefully, the &#8216;a little inconvenience now&#8217; principle will lead to a payoff in the form of &#8216;less chaos later.&#8217; However, that&#8217;s little consolation if, for example, Meiser Square were to be redeveloped again around 2037.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In mid-July, the new Brussels Council of Ministers formally gave the green light to the redevelopment of General Meiser Square in Schaerbeek, popularly known as Misery Square.\u00a0The original plan was to begin the redevelopment in the spring of 2025, but the current goal is to start construction by the summer of 2027. For a long [&hellip;]<\/p>\n","protected":false},"author":164,"featured_media":190558,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"{title}\r\n\r\n{excerpt}\r\n\r\n{url}","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"_wpas_customize_per_network":false,"jetpack_post_was_ever_published":false},"categories":[77170,7,26,31,4],"tags":[],"class_list":["post-190527","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-belgium","category-mobility","category-public-transport","category-road-safety","category-top-stories-today"],"acf":[],"featured_image_urls_v2":{"full":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?fit=2048%2C1365&ssl=1",2048,1365,false],"thumbnail":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?resize=150%2C150&ssl=1",150,150,true],"medium":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?fit=300%2C200&ssl=1",300,200,true],"medium_large":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?fit=640%2C427&ssl=1",640,427,true],"large":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?fit=640%2C427&ssl=1",640,427,true],"1536x1536":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?fit=1536%2C1024&ssl=1",1536,1024,true],"2048x2048":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?fit=2048%2C1365&ssl=1",2048,1365,true],"trp-custom-language-flag":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?fit=18%2C12&ssl=1",18,12,true],"related-thumb":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?resize=640%2C480&ssl=1",640,480,true],"gform-image-choice-sm":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?resize=300%2C300&ssl=1",300,300,true],"gform-image-choice-md":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?resize=400%2C400&ssl=1",400,400,true],"gform-image-choice-lg":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?resize=600%2C600&ssl=1",600,600,true],"mailchimp":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?fit=560%2C373&ssl=1",560,373,true],"unipress-phone":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?resize=640%2C100&ssl=1",640,100,true],"unipress-tablet":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?resize=1536%2C240&ssl=1",1536,240,true],"unipress-tablet-portrait":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?resize=1536%2C180&ssl=1",1536,180,true],"unipress-tablet-landscape":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?resize=2048%2C180&ssl=1",2048,180,true],"unipress-smartphone":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?resize=1080%2C168&ssl=1",1080,168,true],"unipress-wide-screen":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?resize=2048%2C180&ssl=1",2048,180,true]},"post_excerpt_stackable_v2":"<p>In mid-July, the new Brussels Council of Ministers formally gave the green light to the redevelopment of General Meiser Square in Schaerbeek, popularly known as Misery Square.\u00a0The original plan was to begin the redevelopment in the spring of 2025, but the current goal is to start construction by the summer of 2027. For a long time, there were plans for a combination of a tram tunnel and a car tunnel under the square. However, the car tunnel was scrapped because it was too expensive. Plans to run tram line 7 specifically under the square itself have now also been put&hellip;<\/p>\n","category_list_v2":"<a href=\"https:\/\/newmobility.news\/en\/category\/belgium\/\" rel=\"category tag\">Belgium<\/a>, <a href=\"https:\/\/newmobility.news\/en\/category\/mobility\/\" rel=\"category tag\">Mobility<\/a>, <a href=\"https:\/\/newmobility.news\/en\/category\/public-transport\/\" rel=\"category tag\">Public transport<\/a>, <a href=\"https:\/\/newmobility.news\/en\/category\/road-safety\/\" rel=\"category tag\">Road safety<\/a>, <a href=\"https:\/\/newmobility.news\/en\/category\/top-stories-today\/\" rel=\"category tag\">Top Stories Today<\/a>","author_info_v2":{"name":"Luc Joris","url":"https:\/\/newmobility.news\/en\/author\/belga-5\/"},"comments_num_v2":"0 comments","yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>No tram tunnel for Brussels Meiser Square, at least for now - newmobility.news<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newmobility.news\/en\/2026\/07\/30\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"No tram tunnel for Brussels Meiser Square, at least for now - newmobility.news\" \/>\n<meta property=\"og:description\" content=\"In mid-July, the new Brussels Council of Ministers formally gave the green light to the redevelopment of General Meiser Square in Schaerbeek, popularly known as Misery Square.\u00a0The original plan was to begin the redevelopment in the spring of 2025, but the current goal is to start construction by the summer of 2027. For a long [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newmobility.news\/en\/2026\/07\/30\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\/\" \/>\n<meta property=\"og:site_name\" content=\"newmobility.news\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/search\/top\/?q=newmobility.news\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-30T10:15:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Luc Joris\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@jorisvry\" \/>\n<meta name=\"twitter:site\" content=\"@jorisvry\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Luc Joris\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/07\\\/30\\\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/07\\\/30\\\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\\\/\"},\"author\":{\"name\":\"Luc Joris\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#\\\/schema\\\/person\\\/9b4a04002179d83e5be74f13c664b722\"},\"headline\":\"No tram tunnel for Brussels Meiser Square, at least for now\",\"datePublished\":\"2026-07-30T10:15:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/07\\\/30\\\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\\\/\"},\"wordCount\":799,\"publisher\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/07\\\/30\\\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/230628_meiser-vue-02.png?fit=2048%2C1365&ssl=1\",\"articleSection\":[\"Belgium\",\"Mobility\",\"Public transport\",\"Road safety\",\"Top Stories Today\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/07\\\/30\\\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\\\/\",\"url\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/07\\\/30\\\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\\\/\",\"name\":\"No tram tunnel for Brussels Meiser Square, at least for now - newmobility.news\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/07\\\/30\\\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/07\\\/30\\\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/230628_meiser-vue-02.png?fit=2048%2C1365&ssl=1\",\"datePublished\":\"2026-07-30T10:15:43+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/07\\\/30\\\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/newmobility.news\\\/2026\\\/07\\\/30\\\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/07\\\/30\\\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\\\/#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/230628_meiser-vue-02.png?fit=2048%2C1365&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/230628_meiser-vue-02.png?fit=2048%2C1365&ssl=1\",\"width\":2048,\"height\":1365,\"caption\":\"The redevelopment of Meiser Square will not include a tram tunnel for the time being, although that might become desirable someday if the Mediatram is also added \\\/Brussels Mobility\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/07\\\/30\\\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/newmobility.news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"No tram tunnel for Brussels Meiser Square, at least for now\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#website\",\"url\":\"https:\\\/\\\/newmobility.news\\\/\",\"name\":\"newmobility.news\",\"description\":\"A B2BNews Agency\u00ae news service for mobility business proessional\",\"publisher\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/newmobility.news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#organization\",\"name\":\"B2BNews Agency\",\"url\":\"https:\\\/\\\/newmobility.news\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2018\\\/01\\\/b2bnews-agency-logo.png\",\"contentUrl\":\"https:\\\/\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2018\\\/01\\\/b2bnews-agency-logo.png\",\"width\":\"581\",\"height\":\"117\",\"caption\":\"B2BNews Agency\"},\"image\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/search\\\/top\\\/?q=newmobility.news\",\"https:\\\/\\\/x.com\\\/jorisvry\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/jorisvanroy\\\/\",\"https:\\\/\\\/nl.pinterest.com\\\/jorisvanroy\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#\\\/schema\\\/person\\\/9b4a04002179d83e5be74f13c664b722\",\"name\":\"Luc Joris\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g\",\"caption\":\"Luc Joris\"},\"url\":\"https:\\\/\\\/newmobility.news\\\/en\\\/author\\\/belga-5\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"No tram tunnel for Brussels Meiser Square, at least for now - newmobility.news","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newmobility.news\/en\/2026\/07\/30\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\/","og_locale":"en_US","og_type":"article","og_title":"No tram tunnel for Brussels Meiser Square, at least for now - newmobility.news","og_description":"In mid-July, the new Brussels Council of Ministers formally gave the green light to the redevelopment of General Meiser Square in Schaerbeek, popularly known as Misery Square.\u00a0The original plan was to begin the redevelopment in the spring of 2025, but the current goal is to start construction by the summer of 2027. For a long [&hellip;]","og_url":"https:\/\/newmobility.news\/en\/2026\/07\/30\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\/","og_site_name":"newmobility.news","article_publisher":"https:\/\/www.facebook.com\/search\/top\/?q=newmobility.news","article_published_time":"2026-07-30T10:15:43+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02-1024x683.png","type":"image\/png"}],"author":"Luc Joris","twitter_card":"summary_large_image","twitter_creator":"@jorisvry","twitter_site":"@jorisvry","twitter_misc":{"Written by":"Luc Joris","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/newmobility.news\/2026\/07\/30\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\/#article","isPartOf":{"@id":"https:\/\/newmobility.news\/2026\/07\/30\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\/"},"author":{"name":"Luc Joris","@id":"https:\/\/newmobility.news\/#\/schema\/person\/9b4a04002179d83e5be74f13c664b722"},"headline":"No tram tunnel for Brussels Meiser Square, at least for now","datePublished":"2026-07-30T10:15:43+00:00","mainEntityOfPage":{"@id":"https:\/\/newmobility.news\/2026\/07\/30\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\/"},"wordCount":799,"publisher":{"@id":"https:\/\/newmobility.news\/#organization"},"image":{"@id":"https:\/\/newmobility.news\/2026\/07\/30\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?fit=2048%2C1365&ssl=1","articleSection":["Belgium","Mobility","Public transport","Road safety","Top Stories Today"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/newmobility.news\/2026\/07\/30\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\/","url":"https:\/\/newmobility.news\/2026\/07\/30\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\/","name":"No tram tunnel for Brussels Meiser Square, at least for now - newmobility.news","isPartOf":{"@id":"https:\/\/newmobility.news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newmobility.news\/2026\/07\/30\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\/#primaryimage"},"image":{"@id":"https:\/\/newmobility.news\/2026\/07\/30\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?fit=2048%2C1365&ssl=1","datePublished":"2026-07-30T10:15:43+00:00","breadcrumb":{"@id":"https:\/\/newmobility.news\/2026\/07\/30\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newmobility.news\/2026\/07\/30\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/newmobility.news\/2026\/07\/30\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\/#primaryimage","url":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?fit=2048%2C1365&ssl=1","contentUrl":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?fit=2048%2C1365&ssl=1","width":2048,"height":1365,"caption":"The redevelopment of Meiser Square will not include a tram tunnel for the time being, although that might become desirable someday if the Mediatram is also added \/Brussels Mobility"},{"@type":"BreadcrumbList","@id":"https:\/\/newmobility.news\/2026\/07\/30\/no-tram-tunnel-for-brussels-meiser-squares-at-least-for-now\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/newmobility.news\/"},{"@type":"ListItem","position":2,"name":"No tram tunnel for Brussels Meiser Square, at least for now"}]},{"@type":"WebSite","@id":"https:\/\/newmobility.news\/#website","url":"https:\/\/newmobility.news\/","name":"newmobility.news","description":"A B2BNews Agency\u00ae news service for mobility business proessional","publisher":{"@id":"https:\/\/newmobility.news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newmobility.news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/newmobility.news\/#organization","name":"B2BNews Agency","url":"https:\/\/newmobility.news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/newmobility.news\/#\/schema\/logo\/image\/","url":"https:\/\/newmobility.news\/wp-content\/uploads\/2018\/01\/b2bnews-agency-logo.png","contentUrl":"https:\/\/newmobility.news\/wp-content\/uploads\/2018\/01\/b2bnews-agency-logo.png","width":"581","height":"117","caption":"B2BNews Agency"},"image":{"@id":"https:\/\/newmobility.news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/search\/top\/?q=newmobility.news","https:\/\/x.com\/jorisvry","https:\/\/www.linkedin.com\/in\/jorisvanroy\/","https:\/\/nl.pinterest.com\/jorisvanroy\/"]},{"@type":"Person","@id":"https:\/\/newmobility.news\/#\/schema\/person\/9b4a04002179d83e5be74f13c664b722","name":"Luc Joris","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g","caption":"Luc Joris"},"url":"https:\/\/newmobility.news\/en\/author\/belga-5\/"}]}},"jetpack_publicize_connections":[],"jetpack_shortlink":"https:\/\/wp.me\/p9wJdU-Nz1","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack-related-posts":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/07\/230628_meiser-vue-02.png?fit=2048%2C1365&ssl=1","_links":{"self":[{"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/posts\/190527","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/users\/164"}],"replies":[{"embeddable":true,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/comments?post=190527"}],"version-history":[{"count":10,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/posts\/190527\/revisions"}],"predecessor-version":[{"id":190588,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/posts\/190527\/revisions\/190588"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/media\/190558"}],"wp:attachment":[{"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/media?parent=190527"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/categories?post=190527"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newmobility.news\/en\/wp-json\/wp\/v2\/tags?post=190527"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}