{"id":190749,"date":"2026-08-03T12:35:31","date_gmt":"2026-08-03T10:35:31","guid":{"rendered":"https:\/\/newmobility.news\/?p=190749"},"modified":"2026-08-03T12:00:27","modified_gmt":"2026-08-03T10:00:27","slug":"new-bike-path-construction-site-opens-at-brussels-quatre-bras","status":"publish","type":"post","link":"https:\/\/newmobility.news\/nl\/2026\/08\/03\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\/","title":{"rendered":"Nieuwe fietspadbouwplaats geopend bij Quatre-Bras in Brussel"},"content":{"rendered":"<p>Op de Chauss\u00e9e de Malines\/Mechelsesteenweg, tussen het kruispunt Quatre-Bras\/Vierarmen en de Avenue des Foug\u00e8res\/Varenslaan in Wezembeek-Oppem, zijn de werkzaamheden voor de aanleg van een nieuw fietspad van start gegaan.<\/p>\n<p>Het fietspad zal het kruispunt Quatre-Bras\/Vierarmen op de Ring verbinden met de E40. Het traject loopt grotendeels langs de Brusselse Ring tussen Tervuren en Zaventem.<\/p>\n<p>Op die manier wil de Vlaamse regering de fietssnelwegen Brussel-Leuven (F203), Brussel-Wezembeek-Oppem (FWOB) en Brussel-Tervuren met elkaar verbinden.<\/p>\n<h4>In 2 fasen<\/h4>\n<p>Vanwege de bouwwerkzaamheden is de Chauss\u00e9e de Malines\/Mechelsesteenweg tot half oktober afgesloten voor het verkeer in de richting van de Ring. Volgens de gemeente Wezembeek-Oppem blijft het kruispunt Quatre-Bras\/Vierarmen echter bereikbaar en zijn er geen gevolgen voor de snelweg.<\/p>\n<p>In een tweede fase zullen de bouwwerkzaamheden zich langs de Ring voortzetten, eerst in Wezembeek-Oppem en daarna in de richting van Zaventem.<\/p>\n<h4>3 extra fietsbruggen<\/h4>\n<p>Naast de aanleg van het verkeersgescheiden fietspad worden er ook drie nieuwe fietsbruggen gebouwd. E\u00e9n brug komt over de Avenue de Wezembeek\/Wezembeeklaan, een tweede over de Avenue Oscar De Burbure\/Oscar De Barburelaan en een derde over de Rue Alphonse Lenaerts\/Alphonse Lenaertsstraat.<\/p>\n<p>Dit is niet het eerste fietsproject op deze locatie. In november 2024 werd op datzelfde kruispunt een opvallende houten fiets- en voetgangersbrug van 67,5 meter, ontworpen door Ney &amp; Partners, geopend als onderdeel van de F29-fietssnelweg tussen Brussel, Tervuren en Leuven.<\/p>\n<p>De werkzaamheden zullen naar verwachting in januari 2028 zijn afgerond.<\/p>","protected":false},"excerpt":{"rendered":"<p>On the Chauss\u00e9e de Malines\/Mechelsesteenweg, between the Quatre-Bras\/Vierarmen intersection and Avenue des Foug\u00e8res\/Varenslaan in Wezembeek-Oppem, work has begun on the construction of a new bike path. The bike path will connect the Quatre-Bras\/Vierarmen intersection on the Ring with the E40. The route runs largely along the Brussels Ring Road between Tervuren and Zaventem. In this [&hellip;]<\/p>\n","protected":false},"author":164,"featured_media":190757,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"{title}\r\n\r\n{excerpt}\r\n\r\n{url}","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"_wpas_customize_per_network":false,"jetpack_post_was_ever_published":false},"categories":[77170,7,31,4],"tags":[],"class_list":["post-190749","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-belgium","category-mobility","category-road-safety","category-top-stories-today"],"acf":[],"featured_image_urls_v2":{"full":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?fit=916%2C610&ssl=1",916,610,false],"thumbnail":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?resize=150%2C150&ssl=1",150,150,true],"medium":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?fit=300%2C200&ssl=1",300,200,true],"medium_large":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?fit=640%2C426&ssl=1",640,426,true],"large":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?fit=640%2C426&ssl=1",640,426,true],"1536x1536":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?fit=916%2C610&ssl=1",916,610,true],"2048x2048":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?fit=916%2C610&ssl=1",916,610,true],"trp-custom-language-flag":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?fit=18%2C12&ssl=1",18,12,true],"related-thumb":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?resize=640%2C480&ssl=1",640,480,true],"gform-image-choice-sm":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?resize=300%2C300&ssl=1",300,300,true],"gform-image-choice-md":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?resize=400%2C400&ssl=1",400,400,true],"gform-image-choice-lg":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?resize=600%2C600&ssl=1",600,600,true],"mailchimp":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?fit=560%2C373&ssl=1",560,373,true],"unipress-phone":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?resize=640%2C100&ssl=1",640,100,true],"unipress-tablet":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?resize=916%2C240&ssl=1",916,240,true],"unipress-tablet-portrait":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?resize=916%2C180&ssl=1",916,180,true],"unipress-tablet-landscape":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?resize=916%2C180&ssl=1",916,180,true],"unipress-smartphone":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?resize=916%2C168&ssl=1",916,168,true],"unipress-wide-screen":["https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?resize=916%2C180&ssl=1",916,180,true]},"post_excerpt_stackable_v2":"<p>On the Chauss\u00e9e de Malines\/Mechelsesteenweg, between the Quatre-Bras\/Vierarmen intersection and Avenue des Foug\u00e8res\/Varenslaan in Wezembeek-Oppem, work has begun on the construction of a new bike path. The bike path will connect the Quatre-Bras\/Vierarmen intersection on the Ring with the E40. The route runs largely along the Brussels Ring Road between Tervuren and Zaventem. In this way, the Flemish government aims to connect the Brussels-Leuven (F203), Brussels-Wezembeek-Oppem (FWOB), and Brussels-Tervuren bike highways. In 2 phases Due to the construction work, the Chauss\u00e9e de Malines\/Mechelsesteenweg will be closed to traffic heading toward the Ring until mid-October. However, according to the municipality of&hellip;<\/p>\n","category_list_v2":"<a href=\"https:\/\/newmobility.news\/nl\/category\/belgium\/\" rel=\"category tag\">Belgium<\/a>, <a href=\"https:\/\/newmobility.news\/nl\/category\/mobility\/\" rel=\"category tag\">Mobility<\/a>, <a href=\"https:\/\/newmobility.news\/nl\/category\/road-safety\/\" rel=\"category tag\">Road safety<\/a>, <a href=\"https:\/\/newmobility.news\/nl\/category\/top-stories-today\/\" rel=\"category tag\">Top Stories Today<\/a>","author_info_v2":{"name":"Luc Joris","url":"https:\/\/newmobility.news\/nl\/author\/belga-5\/"},"comments_num_v2":"0 comments","yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>New bike path construction site opens at Brussels Quatre-Bras - newmobility.news<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newmobility.news\/nl\/2026\/08\/03\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\/\" \/>\n<meta property=\"og:locale\" content=\"nl_BE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"New bike path construction site opens at Brussels Quatre-Bras - newmobility.news\" \/>\n<meta property=\"og:description\" content=\"On the Chauss\u00e9e de Malines\/Mechelsesteenweg, between the Quatre-Bras\/Vierarmen intersection and Avenue des Foug\u00e8res\/Varenslaan in Wezembeek-Oppem, work has begun on the construction of a new bike path. The bike path will connect the Quatre-Bras\/Vierarmen intersection on the Ring with the E40. The route runs largely along the Brussels Ring Road between Tervuren and Zaventem. In this [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newmobility.news\/nl\/2026\/08\/03\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\/\" \/>\n<meta property=\"og:site_name\" content=\"newmobility.news\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/search\/top\/?q=newmobility.news\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-03T10:35:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?fit=916%2C610&ssl=1\" \/>\n\t<meta property=\"og:image:width\" content=\"916\" \/>\n\t<meta property=\"og:image:height\" content=\"610\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Luc Joris\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@jorisvry\" \/>\n<meta name=\"twitter:site\" content=\"@jorisvry\" \/>\n<meta name=\"twitter:label1\" content=\"Geschreven door\" \/>\n\t<meta name=\"twitter:data1\" content=\"Luc Joris\" \/>\n\t<meta name=\"twitter:label2\" content=\"Geschatte leestijd\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minuten\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/08\\\/03\\\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/08\\\/03\\\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\\\/\"},\"author\":{\"name\":\"Luc Joris\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#\\\/schema\\\/person\\\/9b4a04002179d83e5be74f13c664b722\"},\"headline\":\"New bike path construction site opens at Brussels Quatre-Bras\",\"datePublished\":\"2026-08-03T10:35:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/08\\\/03\\\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\\\/\"},\"wordCount\":252,\"publisher\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/08\\\/03\\\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Toekomstbeeld-Mechelsesteenweg.png?fit=916%2C610&ssl=1\",\"articleSection\":[\"Belgium\",\"Mobility\",\"Road safety\",\"Top Stories Today\"],\"inLanguage\":\"nl-BE\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/08\\\/03\\\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\\\/\",\"url\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/08\\\/03\\\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\\\/\",\"name\":\"New bike path construction site opens at Brussels Quatre-Bras - newmobility.news\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/08\\\/03\\\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/08\\\/03\\\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Toekomstbeeld-Mechelsesteenweg.png?fit=916%2C610&ssl=1\",\"datePublished\":\"2026-08-03T10:35:31+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/08\\\/03\\\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\\\/#breadcrumb\"},\"inLanguage\":\"nl-BE\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/newmobility.news\\\/2026\\\/08\\\/03\\\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-BE\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/08\\\/03\\\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\\\/#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Toekomstbeeld-Mechelsesteenweg.png?fit=916%2C610&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Toekomstbeeld-Mechelsesteenweg.png?fit=916%2C610&ssl=1\",\"width\":916,\"height\":610,\"caption\":\"This is what the future bike path on Chauss\u00e9e de Malines\\\/Mechelsesteenweg in Wezembeek-Oppem will look like. Construction begins today \\\/Werkenaandering.be\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/2026\\\/08\\\/03\\\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/newmobility.news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"New bike path construction site opens at Brussels Quatre-Bras\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#website\",\"url\":\"https:\\\/\\\/newmobility.news\\\/\",\"name\":\"newmobility.news\",\"description\":\"A B2BNews Agency\u00ae news service for mobility business proessional\",\"publisher\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/newmobility.news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nl-BE\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#organization\",\"name\":\"B2BNews Agency\",\"url\":\"https:\\\/\\\/newmobility.news\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-BE\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2018\\\/01\\\/b2bnews-agency-logo.png\",\"contentUrl\":\"https:\\\/\\\/newmobility.news\\\/wp-content\\\/uploads\\\/2018\\\/01\\\/b2bnews-agency-logo.png\",\"width\":\"581\",\"height\":\"117\",\"caption\":\"B2BNews Agency\"},\"image\":{\"@id\":\"https:\\\/\\\/newmobility.news\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/search\\\/top\\\/?q=newmobility.news\",\"https:\\\/\\\/x.com\\\/jorisvry\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/jorisvanroy\\\/\",\"https:\\\/\\\/nl.pinterest.com\\\/jorisvanroy\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/newmobility.news\\\/#\\\/schema\\\/person\\\/9b4a04002179d83e5be74f13c664b722\",\"name\":\"Luc Joris\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-BE\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g\",\"caption\":\"Luc Joris\"},\"url\":\"https:\\\/\\\/newmobility.news\\\/nl\\\/author\\\/belga-5\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Nieuwe fietspadbouwplaats geopend bij Quatre-Bras in Brussel - newmobility.news","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newmobility.news\/nl\/2026\/08\/03\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\/","og_locale":"nl_BE","og_type":"article","og_title":"New bike path construction site opens at Brussels Quatre-Bras - newmobility.news","og_description":"On the Chauss\u00e9e de Malines\/Mechelsesteenweg, between the Quatre-Bras\/Vierarmen intersection and Avenue des Foug\u00e8res\/Varenslaan in Wezembeek-Oppem, work has begun on the construction of a new bike path. The bike path will connect the Quatre-Bras\/Vierarmen intersection on the Ring with the E40. The route runs largely along the Brussels Ring Road between Tervuren and Zaventem. In this [&hellip;]","og_url":"https:\/\/newmobility.news\/nl\/2026\/08\/03\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\/","og_site_name":"newmobility.news","article_publisher":"https:\/\/www.facebook.com\/search\/top\/?q=newmobility.news","article_published_time":"2026-08-03T10:35:31+00:00","og_image":[{"width":916,"height":610,"url":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?fit=916%2C610&ssl=1","type":"image\/png"}],"author":"Luc Joris","twitter_card":"summary_large_image","twitter_creator":"@jorisvry","twitter_site":"@jorisvry","twitter_misc":{"Geschreven door":"Luc Joris","Geschatte leestijd":"2 minuten"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/newmobility.news\/2026\/08\/03\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\/#article","isPartOf":{"@id":"https:\/\/newmobility.news\/2026\/08\/03\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\/"},"author":{"name":"Luc Joris","@id":"https:\/\/newmobility.news\/#\/schema\/person\/9b4a04002179d83e5be74f13c664b722"},"headline":"New bike path construction site opens at Brussels Quatre-Bras","datePublished":"2026-08-03T10:35:31+00:00","mainEntityOfPage":{"@id":"https:\/\/newmobility.news\/2026\/08\/03\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\/"},"wordCount":252,"publisher":{"@id":"https:\/\/newmobility.news\/#organization"},"image":{"@id":"https:\/\/newmobility.news\/2026\/08\/03\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?fit=916%2C610&ssl=1","articleSection":["Belgium","Mobility","Road safety","Top Stories Today"],"inLanguage":"nl-BE"},{"@type":"WebPage","@id":"https:\/\/newmobility.news\/2026\/08\/03\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\/","url":"https:\/\/newmobility.news\/2026\/08\/03\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\/","name":"Nieuwe fietspadbouwplaats geopend bij Quatre-Bras in Brussel - newmobility.news","isPartOf":{"@id":"https:\/\/newmobility.news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newmobility.news\/2026\/08\/03\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\/#primaryimage"},"image":{"@id":"https:\/\/newmobility.news\/2026\/08\/03\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?fit=916%2C610&ssl=1","datePublished":"2026-08-03T10:35:31+00:00","breadcrumb":{"@id":"https:\/\/newmobility.news\/2026\/08\/03\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\/#breadcrumb"},"inLanguage":"nl-BE","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newmobility.news\/2026\/08\/03\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\/"]}]},{"@type":"ImageObject","inLanguage":"nl-BE","@id":"https:\/\/newmobility.news\/2026\/08\/03\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\/#primaryimage","url":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?fit=916%2C610&ssl=1","contentUrl":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?fit=916%2C610&ssl=1","width":916,"height":610,"caption":"This is what the future bike path on Chauss\u00e9e de Malines\/Mechelsesteenweg in Wezembeek-Oppem will look like. Construction begins today \/Werkenaandering.be"},{"@type":"BreadcrumbList","@id":"https:\/\/newmobility.news\/2026\/08\/03\/new-bike-path-construction-site-opens-at-brussels-quatre-bras\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/newmobility.news\/"},{"@type":"ListItem","position":2,"name":"New bike path construction site opens at Brussels Quatre-Bras"}]},{"@type":"WebSite","@id":"https:\/\/newmobility.news\/#website","url":"https:\/\/newmobility.news\/","name":"nieuwemobiliteit.nieuws","description":"Een nieuwsdienst van B2BNews Agency\u00ae voor professionals in de mobiliteitssector","publisher":{"@id":"https:\/\/newmobility.news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newmobility.news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nl-BE"},{"@type":"Organization","@id":"https:\/\/newmobility.news\/#organization","name":"B2BNieuwsagentschap","url":"https:\/\/newmobility.news\/","logo":{"@type":"ImageObject","inLanguage":"nl-BE","@id":"https:\/\/newmobility.news\/#\/schema\/logo\/image\/","url":"https:\/\/newmobility.news\/wp-content\/uploads\/2018\/01\/b2bnews-agency-logo.png","contentUrl":"https:\/\/newmobility.news\/wp-content\/uploads\/2018\/01\/b2bnews-agency-logo.png","width":"581","height":"117","caption":"B2BNews Agency"},"image":{"@id":"https:\/\/newmobility.news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/search\/top\/?q=newmobility.news","https:\/\/x.com\/jorisvry","https:\/\/www.linkedin.com\/in\/jorisvanroy\/","https:\/\/nl.pinterest.com\/jorisvanroy\/"]},{"@type":"Person","@id":"https:\/\/newmobility.news\/#\/schema\/person\/9b4a04002179d83e5be74f13c664b722","name":"Luc Joris","image":{"@type":"ImageObject","inLanguage":"nl-BE","@id":"https:\/\/secure.gravatar.com\/avatar\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9e27cf9984ae903174b14c7dd33d523290f03fd71803b04bc6e486c7259b2920?s=96&d=mm&r=g","caption":"Luc Joris"},"url":"https:\/\/newmobility.news\/nl\/author\/belga-5\/"}]}},"jetpack_publicize_connections":[],"jetpack_shortlink":"https:\/\/wp.me\/p9wJdU-NCB","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack-related-posts":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/newmobility.news\/wp-content\/uploads\/2026\/08\/Toekomstbeeld-Mechelsesteenweg.png?fit=916%2C610&ssl=1","_links":{"self":[{"href":"https:\/\/newmobility.news\/nl\/wp-json\/wp\/v2\/posts\/190749","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newmobility.news\/nl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newmobility.news\/nl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newmobility.news\/nl\/wp-json\/wp\/v2\/users\/164"}],"replies":[{"embeddable":true,"href":"https:\/\/newmobility.news\/nl\/wp-json\/wp\/v2\/comments?post=190749"}],"version-history":[{"count":7,"href":"https:\/\/newmobility.news\/nl\/wp-json\/wp\/v2\/posts\/190749\/revisions"}],"predecessor-version":[{"id":190777,"href":"https:\/\/newmobility.news\/nl\/wp-json\/wp\/v2\/posts\/190749\/revisions\/190777"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newmobility.news\/nl\/wp-json\/wp\/v2\/media\/190757"}],"wp:attachment":[{"href":"https:\/\/newmobility.news\/nl\/wp-json\/wp\/v2\/media?parent=190749"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newmobility.news\/nl\/wp-json\/wp\/v2\/categories?post=190749"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newmobility.news\/nl\/wp-json\/wp\/v2\/tags?post=190749"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}