Zeeland Bridge to close eight weeks to undergo major maintenance
The Zeeland Bridge was officially inaugurated in December 1965. At that time, it was the longest bridge in Europe /zeeland.nl
The Zeeland Bridge will close for eight weeks next year. The part of the bridge that opens to ships, the so-called 'bascule bridge,' will be renovated, and the road surface will be renewed simultaneously.
The Zeeland Bridge is an impressive structure that spans more than five kilometers. It was o


Comments
Ready to join the conversation?
You must be an active subscriber to leave a comment.
Subscribe Today