![](https://newmobility.news/wp-content/uploads/2024/07/toyota-joins-with-coca-cola-and-air-liquide-for-hydrogen-fuel-cell-truck-test-011-640x480.jpg)
Volkswagen builds €2 billion plant from scratch for Trinity
![](https://newmobility.news/wp-content/uploads/2022/03/DB2021AL01058_medium.jpg)
Volkswagen decided to build a new plant for its flagship EV Trinity in the vicinity of the factory in Wolfsburg. Production should start in 2026 and reach 10 hours for one model. /Volkswagen
Volkswagen wants to build a Giga Wolfsburg, a completely new plant for its flagship EV Trinity. So, instead of adapting and refurbishing the
Comments
Ready to join the conversation?
You must be an active subscriber to leave a comment.
Subscribe Today